Specification for installation, exchange, relocation and removal of gas meters with a maximum capacity not exceeding 6 m3/h - Low pressure (2nd family gases) Ingestion-build-279162 conditions for qualification acceptance and
$153.00
Description
conditions for qualification acceptance and delivery of quick release fastening systems
Deletion of the 350 mg/kg sulfur content
static transfer systems (STS) intended to ensure the continuity of load supply through controlled transfer
This PAS outlines information for inspection
calculation of statistical values
Specification for installation, exchange, relocation and removal of gas meters with a maximum capacity not exceeding 6 m<sup>3</sup>/h - Low pressure (2nd family gases) Ingestion-build-279162 conditions for qualification acceptance andBS 6400 1: 2006 specifies requirements for the installation, exchange, relocation and removal of credit or prepayment diaphragm and ultrasonic gas meters with a maximum capacity not exceeding 6 m h. This new edition represents a full revision of the standard; uses more up to date gas industry terminology, and provides additional information on the installation, exchange, relocation and removal of gas meters with a maximum capacity not exceeding 6 m3 h
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.